Latest news

207: Build 21.3.12 released
Dave Nichols, 30/04/2009

Build 21.3.12 has now been released (01/05/09).

This build has been tested in-house, however we cannot guarantee it to be problem free.


Please trial the new system before committing to it.
If you would like this latest version then please send an e-mail to elaine@make247.co.uk requesting a new CD.

The major changes in this release are:

  • The various PDF documents and help files have been integrated into a unified help system.
  • The scheduler stock allocation algorithm has been enhanced so that it will allocate physical stock to low priority jobs due 'now' as long in so doing it does not compromise high priority jobs due 'later'. It will let the physical stock go 'now' provided it can be replaced in time to meet the 'later' demand.
  • The concept of a 'requisition' has been introduced. A 'requsition' is a requirement for (extra) kit for an approved job. They are created by editing the kit list. Such requisitions are processed by the planning system like any other demand, causing it to buy/make or allocate appropriate stock. This means shop-floor staff can ask for more material by editing the kit list, and its brought to the attention of the planners in the usual way.
  • The works order approval rules have been relaxed such that a works order is allowed to be approved even if its kit has not been ordered yet. Doing so creates a 'requisition' to the planning system. The planning system takes whatever steps are necessary to ensure stock is acquired to meet the requisition demand.
  • As usual, a set of requested tweaks and twiddles as part of the support program.

    • [-3943] 20/03/09 Add ability to override the 'charge for whole batch qty' in the PART of a method [r3144]
    • [-7756] 20/03/09 Add kit issue form to be symmetrical with SFDC [r3142]
    • [-7828] 06/04/09 Allow for returning 0 against an expected return [r3166]
    • [-8389] 18/02/09 Reverse stock allocation strategy [r3034]
    • [-9255] 29/04/09 Complete initial H&M integration [r3224]
    • [-9397] 20/03/09 Show min/max packs on cost tab of mcsUpdate [r3143]
    • [11121] 30/12/08 Get station name from the terminal services session if possible [r2869]
    • [16887] 31/03/09 Allow reserved kit to committed actualisers (initial deposit - not fully tested) [r3159]
    • [21101] 06/01/09 Add option to allow invoices with no value in sdCreateLegacyInvoice [r2892]
    • [21796] 06/04/09 Add consider always certified concept to material [r3167]
    • [21911] 23/12/08 Add RTF facility to notes [r2843]
    • [22494] 23/12/08 Add a slow-moving stock alarm facility [r2847]
    • [22512] 24/12/08 Add analysis cols to value summary [r2859]
    • [22515] 05/01/09 Add ability to use SFDC on WO's with MO's [r2881]
    • [22531] 29/04/09 Revert to simple arrive/last-move dates in value summary [r3223]
    • [22652] 05/01/09 Add issue-some button to msShowStock:Detail [r2882]
    • [22654] 19/03/09 Provide an option to commit kit on approve rather than 'do' it [r3141]
    • [22655] 19/03/09 Add a warning if a supplier part number is duplicated [r3140]
    • [22674] 23/03/09 Only consider real usage moves in the context of non and slow moving stock [r3145]
    • [22709] 30/03/09 Fix WO valuation WRT costs for WOs with more than one book in to same batch [r3154]
    • [22731] 28/01/09 More cost breakdown stuff [r2972]
    • [22843] 19/12/08 Allow manual obsoletion of materials with stock [r2825]
    • [22844] 19/12/08 Add obsolete filter to stock valuation [r2823]
    • [22914] 09/01/09 new writeoff system [r2906]
    • [22936] 19/12/08 Allow inspeciton locations to be edited after stock allocation [r2827]
    • [23255] 06/02/09 Implement an easier UI for setting unit conversion expressions [r3008]
    • [23262] 04/02/09 Add percentages line to cost breakdown [r2996]
    • [23274] 05/02/09 Add euro and dollar currencies as standard [r3002]
    • [23281] 05/02/09 Allow for abstractions in re-size methods [r3000]
    • [23320] 11/02/09 Allow for re-size spec size abstraction [r3012]
    • [23323] 03/03/09 Add order field to grouping and filtering in PO and PO WIP value summaries [r3077]
    • [23328] 11/02/09 Allow for time-zones when sync with server clock [r3014]
    • [23408] 17/02/09 Add 'Approved By' column to polDeliverySchedule [r3028]
    • [23436] 26/02/09 Make RTF fields more backwards compatible with plain text [r3066]
    • [23471] 27/02/09 Show last trading date in cshView [r3071]
    • [23652] 18/03/09 Make paper driver and project type indepedant [r3127]
    • [23958] 08/04/09 Add concept of adjustment invoice and credit-note lines [r3174]
    • [24150] 27/04/09 [24151][24152]Force buy/make, clear PO tickes, add MCH notes for us [r3217]
    • [24172] 24/04/09 Add force cost-recalc option to mchView:PriceList and add lead-time feedback [r3214]

Back to latest news



Match-IT Limited Tel: 0845 1300 510, Fax: 0845 1300 610, Email: enquiries (at) make247.co.uk, Web: www.make247.co.uk